paź 23, 2018

Glass breaks processing plant with the necessary technical infrastructure in Gliwice


Kategoria: Projekty-zrealizowane-EN
Napisał: admin

Period: 2018

Surface area: about 24.500 m2

Provided service:

  • evaluation of measurement results executed by geotechnical internal supervision of General Contractor,
  • control measurements within external supervision during the execution of earth works,
  • geotechnical and hydrogeological consultancy.
Opis na stronie glownej: Glass breaks processing plant, Gliwice
miniatura: mini-gliwice.jpg
zdjecie strona glowna: 
Galeria: {Gallery dir='tluczki-szklane-gliwice'}
Zdjecie glowne: 
alt: